Value at Risk: Parametric (Variance-Covariance)
Finds: A loss limit at a chosen confidence level.
When to use it: Use it for a quick estimate of the loss that should not be exceeded with a chosen confidence over a set period. It assumes returns follow a normal distribution, which understates the chance of extreme losses. Monte Carlo VaR simulates many random paths instead, and historical VaR (next entry) reads the loss from past data.
The formula
In words: VaR = Portfolio value x (z-score x Daily volatility x sqrt(days) − Daily mean return x days)
What each symbol means
| V | Portfolio value | money |
| z_c | Number of standard deviations for the confidence level (2.33 at 99%, 1.645 at 95%) | number |
| sigma | Daily standard deviation of returns | per day |
| mu | Average daily return | per day |
| t | Holding period in days | days |
Worked example
A portfolio is worth 1,000,000. Daily returns have a mean of 0.03% and a standard deviation of 1.2%. What is the 99% VaR over 1 day and over 10 days?
| z-score for the confidence level | 2.326 | |
| 1-day VaR | 1,000,000 × (2.32635 × sd − 0.0003) | 27,616.17 |
| VaR over t days | 1,000,000 × (2.32635 × sd × sqrt(10) − 0.0003 × 10) | 85,278.69 |
The z-score at 99% is 2.326. The 1-day VaR is 27,616.17 and the 10-day VaR is 85,278.69. We expect to lose more than that on only about 1 day in 100.