Monte Carlo Standard Error and Confidence Interval
Finds: how accurate a simulated price is and how many paths you need.
When to use it: Use it to judge how accurate a simulated price is. The error shrinks with the square root of the number of paths, so halving the error needs four times as many paths. A 95% confidence interval is the estimate plus or minus 1.96 standard errors. Variance reduction tricks lower s without more paths.
The formula
In words: Price estimate = average of the discounted payoffs; Standard error = sample standard deviation / sqrt(N); Paths needed for a target error = (sample standard deviation / target error)^2
What each symbol means
| PV_i | Discounted payoff from simulated path i | money |
| N | Number of simulated paths | count |
| s | Sample standard deviation of the discounted payoffs | money |
| SE | Standard error of the price estimate | money |
Worked example
A simulation of 20 paths gives these discounted payoffs: 0, 0, 4.2, 12.5, 0, 7.8, 0, 19.3, 2.1, 0, 0, 6.4, 0, 9.9, 3.3, 0, 0, 15.2, 1.1, 0. Find the price, its error, a 95% interval and the paths needed for an error of 0.25. (20 paths is far too few in practice; it only keeps the example short.)
| Number of paths N | 20 | |
| Price estimate | 4.0900 | |
| Sample standard deviation of the payoffs | 5.8901 | |
| Standard error | 5.89013 ÷ sqrt(20) | 1.3171 |
| 95% interval, lower | 4.09 − 1.96 × 1.31707 | 1.5085 |
| 95% interval, upper | 4.09 + 1.96 × 1.31707 | 6.6715 |
| Paths needed | 556 |
The estimate is 4.0900 with a standard error of 1.3171. The 95% interval runs from 1.5085 to 6.6715. To bring the error down to 0.25 would need about 556 paths.