Simulated Price Step (Monte Carlo)
Finds: one simulated price step.
When to use it: Use it as one step of a Monte Carlo simulation. Repeating it many times with different random z values produces thousands of possible price paths, from which you can estimate risks and option values.
The formula
In words: S(next) = S x exp((mu − sigma^2 / 2) x dt + sigma x sqrt(dt) x z)
What each symbol means
| S | Price at the start of the step | money |
| S(next) | Simulated price at the end of the step | money |
| mu | Expected annual return, as a decimal | per year |
| sigma | Annual volatility, as a decimal | per year |
| dt | Length of the step in years | years |
| z | A random draw from a standard normal distribution (mean 0, standard deviation 1) | number |
Worked example
A share is priced at 100, with an expected return of 8% and a volatility of 20% a year. For a one-year step and a random draw of z = 0.5, what is the simulated price?
| Drift | (0.08 − 0.2^2 ÷ 2) × 1 | 0.0600 |
| Shock | 0.2 × sqrt(1) × 0.5 | 0.1000 |
| New price | 100 × exp(0.06 + 0.1) | 117.35 |
The answer
With z = 0.5 the simulated price is 117.35. A different random z gives a different price.
Want every formula on a few pages?Get the free Cheat Sheet (PDF) →
Calculator
New price117.35